East-West Coordination and Economic Dispatch of Libya's Power System: Economic Value and Transmission Capacity Sensitivity
DOI:
https://doi.org/10.65405/djjst098الكلمات المفتاحية:
economic dispatch; inter-regional exchange; Libyan power system; mixed-integer linear programming; multi-regional dispatch; unit combination.الملخص
Independent day-ahead scheduling in interconnected regions can meet the needs of each region, the system-level economic efficiency is low due to the failure to fully utilize the limited exchanges between regions in the scheduling sequence. This paper constructs a 24-hour mixed-integer linear programming model for the Libyan power system to coordinate and optimize unit combination, start-up and shutdown decisions, economic dispatch, and the total east-west exchange variable. Controlled experiments were conducted under three frameworks with the same regional demand, initial state, unit constraints, time constraints, and calibrated cost coefficients: independent scheduling with zero exchange, coordinated scheduling with an exchange limit of 349.6 MW, and a virtually unconstrained mixed baseline. The study is evaluated based on data from 19 authorized operating days starting in 2025, consisting of 25 thermal power plant modules. The MATLAB optimization toolbox provides the main solution, while independent SciPy/ HiGHS reconstructions validate the objective function, completeness, regional balance, ramp-up capability, and minimum time residual. Throughout the sample, coordinated operation reduced the total target capacity from 97.759 million comparative cost units (CUs) to 97.094 million, achieving 86.17% of the combined economic value, reducing the average committed operating units from 9.80 to 9.11, and decreasing the total number of start-ups and shutdowns from 205 to 196. The coordinated operation plan transmitted 105.85 GWh of absolute power and 87.32 GWh of net power from east to west, with model-predicted load shedding at zero. On peak-value days, the target capacity decreased by 1.448%; on peak days of 8166 MW, the decrease was 0.157%. Transmission capacity sensitivity analysis revealed diminishing returns: high-value cases reached saturation near 750 MW, while peak cases achieved almost all available benefits at 500 MW. These results provide a quantitative screening method for prioritizing detailed national grid studies and developing coordinated operation policies.
التنزيلات
المراجع
[1] AJ Wood, BF Wollenberg and GB Sheblé , Power Generation, Operation and Control, 3rd ed. Hoboken, NJ: Wiley, 2014.
[2] M. Carrión and JM Arroyo, “Computationally efficient mixed-integer linear formulas for cogeneration unit combination problems”, IEEE Transactions on Power Systems, Vol. 21, No. 3, pp. 1371-1378, August 2006, doi : 10.1109/TPWTPWRS.
[3] J. Ostrowski, MF Anjos and A. Vannelli, “A compact mixed-integer linear programming formula for the unit combination problem”, IEEE Transactions on Power Systems, Vol. 27, No. 1, pp. 39-46, February 2012, doi : 10.1109/TPWRS.2011.8.
[4] G. Morales-España, JM Latorre and A. Ramos, “Compact MILP formula for cogeneration unit combination problem”, IEEE Transactions on Power Systems, Vol. 28, No. 4, pp. 4897-4908, November 2013, doi 20120132513.17313.20131313531302013021302130213021302130201313025.130213 .
[5] G. Morales-España, JM Latorre and A. Ramos, “Compact MILP formulas for start-up and shutdown ramps in unit combinations”, IEEE Transactions on Power Systems, Vol. 28, No. 2, pp. 1288-1296, May 2013, doi : 10.110292.1232.32312020123123020123123123023125, 20123235, 13892.1231235, 13292.1231235
[6] B. Knueven, J. Ostrowski and J.-P. Watson, “A mixed integer programming formula for the unit combination problem”, INFORMS J. Comput ., Vol. 32, No. 4, pp. 857-876, 2020, doi : 10.1287/ijoc.2019.09401.
[7] RH Wuijts , M. van den Akker and M. van den Broek, “The impact of modeling choice in the unity commitment problem”, Energy Systems, Vol. 15, pp. 1-63, 2024, doi : 10.1007/s12667-023-00564-5.
[8] RR Shoults, SK Chang, S. Helmick and WM Grady, “Practical approach to unit combination, economic dispatch and cost-saving allocation for multi-regional power pool operation with import and export constraints”, IEEE Trans. Power App. Syst., Vol. PAS-99, No. 2, pp. 625-635, 1980, doi : 10.1109/TPAS.1980.319654.
[9] A. Papavasiliou and SS Oren, “Multi-regional stochastic unit combinations with high wind power penetration in transmission-constrained networks”, Operations Research, Vol. 61, No. 3, pp. 578-592, 2013, doi : 10.1287/opre.2013.1174.
[10] MJ Mokarram , “Robust and efficient parallel processes for coordinating multi-regional economic scheduling problems in the presence of uncertainty”, IET Gener. Transm. Distrib ., Vol. 13, No. 18, pp. 4197-4205, 2019, doi : 10.1049/iet-gtd.2019.199.10.1049/i-gtd.
[11] X. Zheng, H. Chen, Y. Xu, F. Shen and Z. Liang, “A Global Solution Method for Distributed Multi-Region SCUC and Economical Allocation Based on MILP Value Function”, IET Gener. Transm. Distrib ., Vol. 14, No. 16, pp. 3230-3240, doi : 10.1049/iet-gtd.2020.0438.
[12] C. Yingvivatanapong , W.-J. Lee and E. Liu, “Multi-regional generation dispatch in competitive markets”, IEEE Transactions on Power Systems, Vol. 23, No. 1, pp. 196-203, February 2008, doi : 10.1109/TPWTPRS.RS.
[13] A. Aharwar , R. Naresh, V. Sharma and V. Kumar, “Transmission system unit combination problem, models and methods: a review”, Electric Power System Research, Vol. 223, No. 109671, 2023, doi : 10.1016/j.epsr.2023.109671.
[14] C. O'Malley, P. de Mars, L. Badesa and G. Strbac , “Reinforcement learning and mixed integer programming for power plant dispatching in low-carbon systems: comparison and hybridization ,” Applied Energy, Vol. 349, No. 121659, 2023, doi : 10.1016/j.2120123.120212020209.129.2025.12320259.2025.12025.12025.125259.2025.12025.2025.125025.2025.125259.1259.2025.125209.1259.
[15] Á. S. Xavier, F. Qiu and S. Ahmed, “Learning to solve large-scale safety-constrained unit combination problems”, INFORMS J. Comput ., Vol. 33, No. 2, pp. 739-756, 2021, doi : 10.1287/ijoc.2020.0976.
[16 ] L.
[17] M. Liu, X. Kong, K. Xiong, J. Wang and Q. Lin, “Multiscale spacetime converter: a novel model simplification method for day-ahead safety-constrained unit combination”, Applied Energy, Vol. 380, No. 124963, 2025, doi : 10.1016/j.10.1920.j.
[18] A. Ihbal and A. Khalleefah , “Predicting short-term peak load demand in the Libyan power grid using a multiple regression model”, Journal of Pure and Applied Sciences, Vol. 22, No. 3, pp. 124-128, 2023, doi : 10.51984/ jopas.v2i3 .
[19] General Electricity Company of Libya, “Authorized State Operation Records for Academic Unit Combination and Economic Dispatch Studies”, Internal Operation Records, 2025, Unpublished.
[20] P. Virtanen et al., “SciPy 1.0: Basic Algorithms for Scientific Computing in Python”, Natural Methods, Vol. 17, pp. 261-272, 2020, doi : 10.1038/s41592-019-0686-2.
[21] Q. Huangfu and JAJ Hall, “Parallelization Dual Modified Simplex Method”, Mathematical Programming and Computation , Vol. 10, No. 1, pp. 119-142, 2018, doi : 10.1007/s12532-017-0130-5.












