“The Impact of Balancing the Three Constraints (time, Cost, Quality) on the Success of Construction Projects in Libya”. 2026. Al-Farooq Journal of Sciences 2 (ملحق 3): 995-1014. https://doi.org/10.65405/edb2k431.