[1]
2026. The impact of balancing the three constraints (time, cost, quality) on the success of construction projects in Libya. Al-Farooq Journal of Sciences. 2, ملحق 3 (Jul. 2026), 995–1014. DOI:https://doi.org/10.65405/edb2k431.